Southside Hydrotherapy Pool Now Complete
12 AUG 2025
The Southside Hydrotherapy Pool at Tuggeranong’s Lakeside Leisure Centre is ready to welcome the community. Monarch Building Solutions is proud to have delivered this $8.5 million health facility for the ACT Government, with doors opening 25 August 2025.
From the start, this project was about more than bricks and mortar, it was about creating a space that’s welcoming, safe, and accessible for everyone. Working closely with Arthritis ACT, CK Architecture and other stakeholders, we designed and built a facility that removes barriers and supports wellbeing at every step.
Designed for Comfort and Accessibility
Visitors will notice thoughtful features throughout:
Parking & Entry: Extra accessible and standard parking spaces, plus ramps to both the centre and the pool.
Inclusive Facilities: An accessible bathroom and changeroom designed for ease and dignity.
Temperature Control: Underfloor heating and pool water kept at 33–34 °C—matching skin temperature to avoid shock, soothe muscles, and calm the nervous system.
Safety First: Handrails, slip-resistant flooring, and a bariatric-rated hydraulic hoist for safe pool entry.
Practical Touches: Dedicated storage for mobility aids like wheelchairs and scooters.
More Than a Pool
With these features, the Southside Hydrotherapy Pool will play a vital role in rehabilitation, pain management, and recovery for people across Canberra’s south. Whether easing the effects of arthritis, supporting post-surgery recovery, or providing gentle exercise for injury rehabilitation, this facility will be a hub for health and connection.
Delivering this project was a true collaboration; bringing together government, community groups, and our skilled team to create a facility that will serve the region for decades to come.
In the news:
The Southside Hydrotherapy pool project teams proud to stand in the completed state-of-the-art facility.
The new Southside Hydrotherapy pool will open later this month.